Site Plan, Sidewalk Plan, Drainage and Utilities, Subsurface Drainage
Right Turn and Left Turn Lane addition, Sidewalk , Lane taper, pavement marking, signal modification, 2000 LF new median, 4000 LF curb and gutter, 3 new entrances, MOT
Designed from Concept to Occupancy. A TPS Design/Build Project
TPS designed/built 2000 feet Right Turn Lane Addition
Water Line Installation, Gas Line Relocation, Storm Sewer Design and Installation, Hydrant Installation, ROW dedication, VDOT street acceptance
Special Exceptions, Site Plan, Road Frontage Improvement, VDOT Land Use Permit, Site Development Permit, Building Permit
Special Exception, Site Plan, Site and Building Permits,Bonding and Bond Release
Rezoning and Special Use Permit, Storm Water Management, Sand Filter, Roadway Dualization, Bonding and Bond Release
Road Frontage Improvement, Site and Building Permit, Sign Permits, Storm Water/BMP Management
Special Use Permit, Site Plan, Building Design Coordination, Storm Water Management Waiver
Site Plan, Road Frontage Improvement, Fire Pump, Sign Permits, Site and Building Permit
Roadway Dualization, Owner Representation in Site and building Development, Coordination with Architect and Contractors, Coordination with County and VDOT regulators/inspectors, Bonding
Special Use Permit, General Development Plan, Pad Ready Design with utility coordination, Owner Representation
Special Use/Exception Permits, Utilities Management and Design, Land Acquisition Assistance, Bonding, Site/Road Frontage Design and Permit Processing, Spill Prevention Control, SPCC Plan, Architectural Coordination and Permit Processing, DOT Coordination/approvals
Special Use/Exception Permits, Utilities Management and Design, Land Acquisition Assistance, Bonding, Site/Road Frontage Design and Permit Processing, Spill Prevention Control, SPCC Plan, Architectural Coordination and Permit Processing, DOT Coordination/approvals
Special Use/Exception Permits, Utilities Management and Design, Land Acquisition Assistance, Bonding, Site/Road Frontage Design and Permit Processing, Spill Prevention Control, SPCC Plan, Architectural Coordination and Permit Processing, DOT Coordination/approvals
Retail Center Site Plan, Site Development Permit Processing, Construction Site Inspection Assistance
Site Development Plan, Storm Water management, Road Access Plan, Site Pavers, Access Plan